Draw an Emergency Load Window

The inner hatch in Borrowed Air needs enough current to open under load. In the first exercise, pressing its control instantly erased the sensor screen and the last reported trace. This made the electrical failure hard to distinguish from an error in the instrument. We changed both the power schedule and the record of the interruption, letting a player decide what they need to observe while the circuit is still available.
Show how the branch changes during the move
Approach the hatch from the service desk. Its standby switch can run on the same source as the two hull sensors. The movement of the hatch uses more power than the standby switch. The current model gives movement priority on that branch and briefly closes the sensor gate. A bar beside the hatch shows the upcoming interval. The power source has enough reserve for the movement and a short listening period after it settles.
The previous display used a single remaining-power number. It could show enough charge for all of the work and leave the reader with no reason to expect a missed sensor pulse. The revised display shows load over part of the move as well as remaining charge. The player can see that two devices competing at the same moment create a short blind window even when plenty of reserve returns afterward.
Leave the last intact reading at the desk
When the gate closes, the last complete pair stays on screen with the time it came in. The display marks the new gap separately. A player can look back at the pair before the hatch opens, or inspect it from the far side after crossing. They can also recover an earlier partial measurement whose reference they already know. This makes the decision to move depend on what the existing record can support.
We wanted a useful distinction between a gate that remained open and heard nothing, and a gate that could not hear. On the revised strip a quiet period retains the baseline observed from the active receiver. A power interruption shows a blank interval with a beginning and an expected recovery. If the sensor resumes later than expected, it records the actual return.
Offer a route that delays the conflict
Moving through the nearest door while a signal is expected is convenient. A longer route allows time for one more observation and consumes some remaining power during the walk. The current prototype presents both through the location of the controls. The astronaut can stay by the desk until the next arrival, or walk to a position near the hatch where they are ready to use it. Either way the sensors do not start a new reading while the electric move takes priority.
The routes are more interesting if the player can retreat after trying one. Looking at the last intact measurement can provide enough context to choose a safe location from which to resume. The band marking the gap changes with the actual sequence and remains separate from the window showing a proposed movement.
Read the gap in the context of a complete run
Borrowed Air’s reserve exercise checks what a player will do when the pressure marks disagree and the hatch is available to open. The listening gate entry explains why a limited recording can still tell you where to wait. The panel arrivals study shows what the original pair preserved. During the next review we will check whether a reader can close the gate, move through the hatch and return to their previous observation without assuming it happened in the interval when the sensors were unavailable.